1 house today → about 15 homes as terraces. About 2,500 m², 150 m frontage, zone R3.

Residual land valueA$32.5m
Likely ask (1 house)A$24.0mFrom the 1 July 2025 land value x 1.15
HeadroomA$8.5m
Claim this site

A$387 inc GST · 3 months

A claim takes this site off the market for every other member for 3 months and opens its address, lot outline, exact figures and neighbours to you.

This site is A$387 because its best option clears a 40% margin on cost at the likely ask. Other sites are A$182. One claim credit claims any site.

Card payment through Stripe. Have an account? Sign in. A claim is exclusive on Build Design Solutions only: it gives no right over the property, and the owner can still sell to anyone. How claims work.

Every option the rules allow

OptionHomesStoreysGFARealisationCostsResidual land valueHeadroomProfit at likely ask
TerracesLow and Mid-Rise · FSR 0.9:1 · 12.5 m 1522,250 m² A$65.0mA$12.0mA$32.5mA$8.5m A$19.0m48% on cost · 30% on revenue
Cost stack
  • Construction 2,250 m² at A$4,300/m²A$9.5m
  • Basement parkingA$500k
  • DemolitionA$45k
  • Consultants, DA and certification (9%)A$900k
  • Contributions (A$28,000 per new home)A$400k
  • Contingency (5%)A$550k
  • Then selling costs 3%, GST on the margin, finance 7.5%, stamp duty 5.5% and a 20% developer margin solve for the land. Buying at the likely ask of A$24.0m instead leaves A$19.0m pre-tax on a total development cost of A$40.0m.
Apartments, up to 6 storeys + affordable housing bonusLow and Mid-Rise + Chapter 2 bonus (15% affordable) · FSR 1.95:1 · 22.8 m 5065,000 m² A$90.0mA$32.5mA$27.5mA$3.5m A$19.0m31% on cost · 21% on revenue
Cost stack
  • Construction 5,000 m² at A$5,500/m²A$27.5m
  • Basement parkingA$1.7m
  • DemolitionA$45k
  • Consultants, DA and certification (9%)A$2.5m
  • Contributions (A$28,000 per new home)A$1.3m
  • Contingency (5%)A$1.5m
  • Then selling costs 3%, GST on the margin, finance 7.5%, stamp duty 5.5% and a 20% developer margin solve for the land. Buying at the likely ask of A$24.0m instead leaves A$19.0m pre-tax on a total development cost of A$60.0m. Includes 15% affordable housing at 65% of market.
Apartments, up to 4 storeysLow and Mid-Rise (400 to 800 m) · FSR 1.5:1 · 17.5 m 4043,500 m² A$75.0mA$23.0mA$27.5mA$3.5m A$16.0m31% on cost · 22% on revenue
Cost stack
  • Construction 3,500 m² at A$4,900/m²A$18.0m
  • Basement parkingA$1.3m
  • DemolitionA$45k
  • Consultants, DA and certification (9%)A$1.8m
  • Contributions (A$28,000 per new home)A$1.0m
  • Contingency (5%)A$1.1m
  • Then selling costs 3%, GST on the margin, finance 7.5%, stamp duty 5.5% and a 20% developer margin solve for the land. Buying at the likely ask of A$24.0m instead leaves A$16.0m pre-tax on a total development cost of A$50.0m.
TownhousesLow and Mid-Rise · FSR 0.9:1 · 12.5 m 1522,250 m² A$55.0mA$11.0mA$25.0mA$1.0m A$11.0m29% on cost · 21% on revenue
Cost stack
  • Construction 2,250 m² at A$4,100/m²A$9.0m
  • DemolitionA$45k
  • Consultants, DA and certification (9%)A$800k
  • Contributions (A$28,000 per new home)A$375k
  • Contingency (5%)A$500k
  • Then selling costs 3%, GST on the margin, finance 7.5%, stamp duty 5.5% and a 20% developer margin solve for the land. Buying at the likely ask of A$24.0m instead leaves A$11.0m pre-tax on a total development cost of A$40.0m.
Dual occupancyLow and Mid-Rise · FSR 0.9:1 · 12.5 m 22500 m² A$12.0mA$2.3mA$6.5m-A$17.5m -A$18.0m-61% on cost · -150% on revenue
Cost stack
  • Construction 500 m² at A$3,700/m²A$1.9m
  • DemolitionA$45k
  • Consultants, DA and certification (9%)A$170k
  • Contributions (A$28,000 per new home)A$28k
  • Contingency (5%)A$100k
  • Then selling costs 3%, GST on the margin, finance 7.5%, stamp duty 5.5% and a 20% developer margin solve for the land. Buying at the likely ask of A$24.0m instead leaves -A$18.0m pre-tax on a total development cost of A$30.0m.

Site facts

Site area
About 2,500 m² (35 m by 80 m)
Street frontage
About 150 m (measured against the road corridor)
Zone
R3 Medium Density Residential · Waverley Local Environmental Plan 2012
LEP controls
FSR 0.9:1 · height 12.5 m · minimum lot 232 m²
Nearest nominated centre
About 700 m to Rose Bay town centre (New South Head Road) (straight line) · 400 to 800 m from a nominated centre
Land value
About A$21,000,000 at 1 July 2025, NSW Valuer General · from A$17,000,000 at 1 July 2022 (+25%)