Address locked, Marrickville

1 house today → about 25 homes as apartments, up to 8 storeys (tod) + bonus. About 800 m², 15 m frontage, zone R2.

Residual land valueA$3.0m
Likely ask (1 house)A$2.8mFrom the 1 July 2025 land value x 1.15
HeadroomA$250k
Claim this site

A$182 inc GST · 3 months

A claim takes this site off the market for every other member for 3 months and opens its address, lot outline, exact figures and neighbours to you.

Sites whose best option clears a 40% margin on cost at the likely ask are A$387. One claim credit claims any site.

Card payment through Stripe. Have an account? Sign in. A claim is exclusive on Build Design Solutions only: it gives no right over the property, and the owner can still sell to anyone. How claims work.

Every option the rules allow

OptionHomesStoreysGFARealisationCostsResidual land valueHeadroomProfit at likely ask
Apartments, up to 8 storeys (TOD) + affordable housing bonusTransport Oriented Development + Chapter 2 bonus · FSR 3.25:1 · 28.6 m 2582,500 m² A$30.0mA$17.0mA$3.0mA$250k A$5.0m24% on cost · 17% on revenue
Cost stack
  • Construction 2,500 m² at A$5,500/m²A$13.0m
  • Basement parkingA$850k
  • DemolitionA$45k
  • Consultants, DA and certification (9%)A$1.3m
  • Contributions (A$28,000 per new home)A$650k
  • Contingency (5%)A$800k
  • Then selling costs 3%, GST on the margin, finance 7.5%, stamp duty 5.5% and a 20% developer margin solve for the land. Buying at the likely ask of A$2.8m instead leaves A$5.0m pre-tax on a total development cost of A$21.0m. Includes 15% affordable housing at 65% of market.
Apartments, up to 6 storeys (TOD)Transport Oriented Development · FSR 2.5:1 · 22 m 2062,000 m² A$24.0mA$13.0mA$3.0mA$250k A$4.3m25% on cost · 18% on revenue
Cost stack
  • Construction 2,000 m² at A$5,500/m²A$10.0m
  • Basement parkingA$650k
  • DemolitionA$45k
  • Consultants, DA and certification (9%)A$1.0m
  • Contributions (A$28,000 per new home)A$500k
  • Contingency (5%)A$600k
  • Then selling costs 3%, GST on the margin, finance 7.5%, stamp duty 5.5% and a 20% developer margin solve for the land. Buying at the likely ask of A$2.8m instead leaves A$4.3m pre-tax on a total development cost of A$17.0m.
Dual occupancyHousing SEPP (R2 state-wide) · FSR 0.65:1 · 9.5 m 22500 m² A$4.0mA$2.2mA$650k-A$2.1m -A$1.7m-31% on cost · -43% on revenue
Cost stack
  • Construction 500 m² at A$3,700/m²A$1.8m
  • DemolitionA$45k
  • Consultants, DA and certification (9%)A$160k
  • Contributions (A$28,000 per new home)A$28k
  • Contingency (5%)A$100k
  • Then selling costs 3%, GST on the margin, finance 7.5%, stamp duty 5.5% and a 20% developer margin solve for the land. Buying at the likely ask of A$2.8m instead leaves -A$1.7m pre-tax on a total development cost of A$5.5m.

Site facts

Site area
About 800 m² (18 m by 45 m)
Street frontage
About 15 m (measured against the road corridor)
Zone
R2 Low Density Residential · Inner West Local Environmental Plan 2022
LEP controls
FSR 0.6:1 · height 9.5 m · minimum lot not mapped
Nearest nominated centre
About 1,050 m to Dulwich Hill station (straight line) · Transport Oriented Development area
Land value
About A$2,400,000 at 1 July 2025, NSW Valuer General · from A$1,900,000 at 1 July 2021 (+25%)
Notes
Transport Oriented Development area (Dulwich Hill). Holding of 2 parcels.

Neighbours

3 adjoining houses share a boundary with this site. Members see them.